案例与项目记录
用可核验的项目条件支持下一次设备评估
案例应帮助项目团队理解类似应用还需要补充哪些项目资料,而不是替代对实际工况的评估。
Yakeclimate 只在客户授权、图片、设备细节与结果表述经过确认后公开案例内容。
项目记录结构
读懂项目逻辑,而不只是设备名称
每条记录的组织方式,都让项目团队能对照自己的需求,比较条件、技术决策、交付范围、验证方式与已确认结果。
- 应用与项目背景
- 温度、湿度、水分与气流条件
- 安装、控制、进度与市场约束
- 所选设备与适配范围
- 制造、安装或调试责任
- 验证方式与可用证据
- 已确认结果与仍需关注的运行条件
精选项目记录
评审运行条件可比的已核验项目
已发布的记录将支持把环境、技术决策、实施范围与可用证据,与新需求进行对照。
交付案例
Calla Lily Greenhouse Case Study: Nighttime RH at 77.1%
After a calla lily greenhouse of approximately 1,000 m² expanded its dehumidification configuration from one RYCF-22S to two, three-point nighttime average relative humidity decreased from 87.4% to 77.1%. The records also identified persistent high humidity on the cooling-pad side and showed why rated capacity cannot be treated as field performance.
探索该应用 → 02项目记录
How Many Dehumidifiers Does a 5-Hectare Greenhouse Need? A Sizing Walk-Through
A 5-hectare tomato greenhouse holding 75% RH at 16 °C sounds like a single-number question. It isn't. Across the three scenarios below the count runs from 49 to 101 units — more than a factor of two, and a CAPEX spread in the tens of thousands of EUR.
探索该应用 →准备您的项目
用相似案例完善项目资料
案例可用于识别尚未明确的技术资料,但设备选型仍需以真实的温度、湿度目标、湿负荷、气流、安装、电源、排水、控制、数量和进度为准。
- 标记哪些条件与您相似
- 识别哪些条件不同
- 准备您现场已有的运行数据
- 列出影响设备选型的约束
- 提交需求时附上相关案例
相似应用
带着您的工况,讨论一个相似的应用
把引起您注意的项目记录与您自己的运行条件一起发来。我们可以用两者组织一次更有针对性的技术评审。
讨论相似应用